Custom EDM Pure Copper Electrode High Conductivity Custom Molded Plastic Parts
Our advantage
1. Resonable price
2. Good after service
3. Experienced skilled workers and professional engineers
4. Good quality ,excellent service ,long life mould
5. On time delivery time
6. Send project schedule report and pictures to buyer to show the progress of the machineing.
7. Our international sales team work 24 hours per day to serve you
Product info
Please provide
|
2D, 3D, samples, or the size of the multi-angle pictures.
|
||
Mould material
|
45#, 50#, P20, 738, 738H, 718, 718H, NAK80, 2316, 2316A, S136 etc.
|
||
Product material
|
ABS,PA6,PA66,PP,PC,TPU,POM,PBT,PVC,TPE,TPV,TPO,TPR,EVA,LDPE etc.
|
||
Cavity
|
Single-cavity, Multi-cavity or by requested.
|
||
Runner system
|
Cold runner or Hot runner.
|
||
Mould precision
|
±0.01mm.
|
||
Mould Life
|
50-100 million shots.
|
||
Software
|
CAD, PRO-E, UG, Rhinoceros etc.
|
||
Design Time
|
1-3 days (normal circumstances).
|
||
Main thechnology
|
Milling, grinding, CNC, EDM, wire cutting, carving, EDM, lathes etc.
|
Faq
Q1: How can I get a quotation?
A: In order to quote you as soon as possible please provide us the following information:
1) Detail drawings(CAD /PDF/DWG/IGES/STEP/SOLIDWORS) with required tolerance.
2) Required Material and Surface treatment.
3) Planning Quantity.
4) Any special packing or other requirements
Q2: What should I do if I want to place a bulk order?
A: You can place a sample order to confirm the quality first, after you approved the sample, then you can place an official order to us.
Q3: What’s your leading time?
A: Usually 7~10 days for sample order, 30~35 days for bulk order, it depends on your product design and the qty.
Q4: What is the payment term?
A: Sample 100% T/T in advance, Bulk Order 30% T/T deposit in advance, the balance before the shipment; L/C acceptable for big order.
Q5: If I need the parts urgently, can you help?
A: Yes, we are here to help since our production time is flexible. Please tell us the delivery time you need, we will try our best to adjust the production schedule priority for you.